Badminton is a popular sport. Because it is a good way to exercise and strengthen the body function in an all-round way, and it is also an effective way to cultivate good morality and cultivate sentiment. Through exercise and competition, we can also cultivate the indomitable fighting spirit and good will quality, thus improving our physical and psychological quality. The popularity of badminton should begin with the construction of badminton halls. So, Construction of badminton hall What are the basic processes of? Now let's get to know.
Step 1: badminton stadium construction Basic process:
Construction of badminton hall Planning and site selection. First, choose to determine the address of the stadium, and plan the most reasonable construction scheme according to its surrounding environment. The main factors to be considered are: the soil condition of the site, the thickness of the frozen soil layer, the location of groundwater, the direction of the court, the choice of cement or asphalt foundation, and the size of the space and space spacing between multiple courts. The badminton hall should be built according to local conditions, but at least 19 × 37m. Sunshine, shelter from wind, good drainage, low groundwater level, not too close to the highway, no animals, etc., and lawn and plants can be planted around the site; It is convenient for the masses to use; The long sleeves of outdoor venues are basically north-south. Then we will make a detailed plan. If you want to build a badminton stadium, the first question you must consider before proceeding with the project is what kind of surface course should be used on the surface of the stadium? Is it clay surface or modern synthetic plastic surface? The two types have their own advantages and disadvantages, but the synthetic surface materials have been improved in recent years, and their advantages have been very obvious. Silicon pu surface layer has been widely used and recognized.
Step 2: Basic construction of badminton stadium:
stay Construction of badminton hall After the planning and design scheme is out, the foundation construction shall be started. The quality of the stadium almost depends on its infrastructure. Therefore, the professional construction team of the foundation building must be selected for the foundation construction. According to the foundation requirements of the site, the construction must be carried out in strict accordance with the construction standards. The specific site foundation requirements are: cement foundation, namely reinforced concrete foundation. It should be successfully paved with commercial concrete at one time. The reinforcement is added to increase the integrity of the site and prevent the foundation from cracking. Generally, a contraction joint should be left directly below the net in the middle of each field. According to the local environmental conditions, the asphalt foundation is excavated from the ground to the corresponding depth, filled with different materials in turn, and rolled gradually, so that its compactness is not less than 2.35t/m3. The surface asphalt shall be free of pitted surface, honeycomb and oil pollution, and shall not return oil in high temperature in summer. No matter the surface of cement foundation or asphalt foundation, the height difference of flatness is required to be no more than 3mm, that is to say, the average value of flatness error is no more than 3mm when a 3m pressure gauge is used for random measurement and inspection on the site. For outdoor courts, the surface drainage slope is 1:100 to 1:150 (different from the drainage slope of ordinary civil works). In addition, during the foundation construction, it is necessary to prepare the embedment of some accessories in advance, so as to avoid missing and future rework that will damage the integrity of the foundation.
Step 3: Facility construction:
After the completion of the stadium construction infrastructure, according to some previously embedded facilities, install the screen and lamp posts around the stadium, and arrange to build a tennis wall as far as possible to facilitate practice.
If the requirements for badminton hall construction cannot be met due to the restrictions of objective conditions, the sponsor can negotiate with the representative teams to modify and make supplementary provisions. The badminton hall construction continues to improve the service quality to meet the needs of customers, Construction of badminton hall High quality raw materials are used, and international and national sports ground construction standards are strictly implemented to create beautiful and comfortable sports spaces for customers.
How much is the badminton hall investment | Construction of badminton hall | Construction of badminton court | Decoration design of badminton hall | Joined in badminton hall | ( kingmould.cn )