First, check the flatness of the foundation layer to find out the uneven places. Before paving the primer, clean the foundation and prepare tools for construction. According to the process requirements, measure the construction parts and place construction markings. The paving shall start from one side of the site, and the speed shall be even when the glue is scraped. After the glue is formed, check to ensure the thickness of the surface glue cushion.
First, check the flatness of the foundation layer to find out the uneven places (for example, the cement concrete foundation needs pickling).
I Construction of badminton court About primer paving agent:
Before paving the primer, clean the foundation and prepare tools for construction.
According to the process requirements, measure the construction parts and place construction markings.
When paving, start from one side of the site and scrape glue at one time according to the width of the site.
The speed of glue scraping shall be even, and the exposed, concave and convex parts shall be repaired or scraped in time.
After the glue is formed, the whole site shall be checked to ensure the thickness of surface glue bedding.
2、 Top glue pavement:
When scraping, shorten the interval time of each bucket of glue liquid as far as possible to make the glue forming speed uniform.
3、 Observe the thickness of the adhesive layer at all times.
Spray a layer of plastic particles before the top glue is cured.
4、 After the surface glue is completely cured, the excess surface glue particles shall be removed.
Spray the adhesive to ensure that the particles do not fall off.