Pay attention to the following key points when installing the badminton hall floor
The structure of movable wood floor is as follows: one layer: rubber mat, leveling, sub floor; The concrete ground shall be leveled, the site shall be thoroughly cleaned, and then paved. Second floor: install upper keel and lower keel; When installing the upper keel and the lower keel, attention should be paid to the position of rubber skids at the ends of the upper keel and the side keel. There should be certain holes in the wall and adjacent keels, the upper keel, the lower keel and the wall to meet the requirements. Three layers: plywood pavement: the plywood pavement angle meets the preset requirements of the drawing.
- eight hundred and forty-six
- 2020-09-25